Thessaloniki gets ready for its metro launch in November
The underground rapid transit lines have been under construction for almost two decades due to various project delays
It will be the second-largest system of its kind in Europe
Szeged is starting a major project for district thermal hearing, worth 22 billion Hungarian forints, the municipality announced at the beginning of the month. A system involving nine geothermal wells starting from the Makkosháza housing estate, aims to become the second-largest in Europe.
A HUF 22 billion geothermal district heating system (61,5 million euros) will be built in Szeged. The development program meant to renovate the district heating system of the third-largest city in Hungary was launched one year ago.
For decades, the city has been supplying district heating to 27,000 homes and 470 institutions. Once the system is fully developed, it could become the second largest in Europe, after the one in Reykjavik. Now, the actual work on its installation has started.
Geothermal heating is a low-emission system that harnesses thermal energy from the earth and converts it into warm air. It works by drilling wells below the earth's surface, where the temperatures remain constant throughout the year. Hungary is one of the top consumers of geothermal heating, which is considered a particularly efficient and clean way to heat or cool a home or a spa.
The new system in Szeged will obtain the necessary thermal energy from nine wells. Four of them are currently under construction and five are in their early stages of preparation. The work will unfold in several phases, but the investment affects practically the entire area of Szeged.
As the experts responsible for the implementation point out, the placement of such a large number of thermal wells, taking into account the already existing ones, requires a series of hydrogeological and geological preliminary studies. The location of the wells was selected based on them and in consultation with the municipality.
According to the experts, the work will not involve dust and vibration, but the noises of the construction may disturb the residents. During the drilling, the equipment is powered by a diesel engine equivalent to a truck engine.
The monotonous noise of the operations can be found annoying, they continue. For this reason, protective measures will be taken, including to cover the equipment with noise protection and install noise protection covers against the nearby residential houses.
Drilling such a well at a depth of 1,800 meters will take two months if no problems arise and some part of it will take place during the night. The drilling works are scheduled to be completed by the end of November while the entirety of the work is expected to last well into 2021.
László Botka, Mayor of Szeged, expressed his approval with the sustainability aspect of the project on Facebook: “We are building Europe's second largest thermal heating system in Szeged. Thanks to the investment, we can keep tens of thousands of families in Szeged warm in a sustainable, environmentally friendly way. We reduce the amount of gas used in district heating by half and therefore our emissions of pollutants.”
The underground rapid transit lines have been under construction for almost two decades due to various project delays
Now you can get your wine in Talence by paying directly in Bitcoin
That’s because the state has to spend money on updating the railway infrastructure rather than subsidizing the cost of the popular pass
Rethinking renewable energy sources for the urban landscape
The examples, compiled by Beyond Fossil Fuels, can inform and inspire communities and entrepreneurs that still feel trepidation at the prospect of energy transition
Now you can get your wine in Talence by paying directly in Bitcoin
The 10th European Conference on Sustainable Cities and Towns (ESCT) sets the stage for stronger cooperation between the EU, national and local level to fast track Europe's transition to climate neutrality.
At least, that’s the promise made by the mayor of Paris, Anne Hidalgo
The underground rapid transit lines have been under construction for almost two decades due to various project delays
At least, that’s the promise made by the mayor of Paris, Anne Hidalgo
Hostal de Pinós is located in the geographical centre of the autonomous region
Despite its church-y name, the district has long been known as the hangout spot for the artsy crowds
Urban dwellers across the EU are having a say in making their surroundings friendlier to people and the environment.
Forests in the EU can help green the European construction industry and bolster a continent-wide push for architectural improvements.
Apply by 10 November and do your part for the transformation of European public spaces
An interview with the Mayor of a Polish city that seeks to reinvent itself
An interview with the newly elected ICLEI President and Mayor of Malmö
A conversation with the Mayor of Lisbon about the spirit and dimensions of innovation present in the Portuguese capital